| 1508: | Cardinal Matthäus long builds the Dompropstei. |
| 1521: | Augsburger city plan of Jörg Seld shows the three-floored building of the Dompropstei. |
| 1803: | The secularized Dompropstei changes into the possession of the realm city Augsburg, which sells her 1804. |
| 1858: | To the earlier Dompropstei a memorial tablet is attached, which reminds of the builder and of the visits of the emperor Maximilians I. |
| 1895: | The association “catholic casino” furnishes guest rooms in the former Dompropstei. |
| 1919: | Josef Dietrich leases the former cathedral. He is the large and/or great-grandfather of the today’s owners Gerd and Josef Illig. The house is called at that time “Goldene Glocke”. |
| 1941: | Josef Dietrich acquires the “Goldene Glocke”. |
| 1946: | The hotel in the 1944 hit by bombs former Dompropstei is again developed. |
| 1972: | The “Goldene Glocke” is renamed in “Dom Hotel” |
| 2008: | The “Dom Hotel” can look back on 500-years of house history. |
| 2010: | The facade of the “Dom Hotel” is being renovated and awarded by the Friedrich-Prince Foundation of the City of Augsburg. Award certificate facades 2010 |
| 2011 – 2013: | An energy concept was developed for the entire building. As a result, the roof area in the oldest part of the Dom Hotel was renovated and all other roof areas were refurbished to improve energy efficiency. |
| 2013: | Installation of a combined heat and power plant and a digital heating control system. |
| 2014 – 2016: | Over the years, numerous rooms throughout the hotel have been renovated and the historic courtyard has been repaved. |
| 2017 – 2018: | Other rooms in the hotel have been renovated, a new garage exit, a luggage room and new toilet facilities have been built. |
| 2019 – 2020: | During these years, the maisonettes and the rooms below were completely renovated and equipped with cooling ceilings, and the lift systems were brought up to date. |
| 2021 – 2022: | During the period in question, work continued on the cooling/heating concept and the associated building management system. |
| 2022 – 2023: | After a lengthy approval process, a photovoltaic system, a corresponding electricity storage unit and wall boxes were installed, and the cooling system was put into operation in parts of the Dom Hotel. |
| 2024 – 2025: | The guest rooms in another part of the building were completely renovated and equipped with air conditioning. |